YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
1989 3 Months Supply & install of air conditioning system of capacity 100 T.R Designed by Eng. Mohamed A.A El Shafiey Misr Travel NIPHTESE FLOATING HOTEL
1990 4 Months Supply & install electrical work Designed by Eng. Mohamed A.A El Shafiey Mr. Mahmoud El Shaarawi QUESSNA COLD STORE
1990 4 Months Supply & install of air conditioning system of capacity 120 T.R Dar Al handassah (shaier & partners) Dream Boat Co. NILE SECRET FLOATING HOTEL
1993 1.5 Months Supply & install of air conditioning system of capacity 70 T.R Prof. Dr. Ahmed Shaher Misr Travel NOPAL FLOATING RESTAURANT
1993 4 Months Supply & install of air conditioning system of capacity 80 T.R Bakry Consulting Engineers Red Sea Diving And Safari Co. M/S FORTUNE – 1 FLOATING HOTEL
1992 24 Months All plumbing work, fire fighting and irrigation network Dar Al handassah (shaier & partners) The Arab Investment Tourism Development Co. EL NOUR HILTON VILLAGE – HURGHADA
1993 8 Months Supply & install of air conditioning system of capacity 300 T.R Bakry Consulting Engineers Mr. Ahmed Abdel Wahab ZAMALEK COMMERCIAL CENTER (KENOZE)
1993 4 Months Supply & install of air conditioning system of capacity 170 T.R Bakry Consulting Engineers Sakara Tours SONESTA SUN GOODIES FLOATING HOTEL
1994 1 Months Supply & install of air conditioning system of capacity 40 T.R Designed by Eng. Mohamed A.A El Shafiey Mr. Khaled Sabri KATCHO –417- RESTAURANT
1994 1 Months Supply & install of air conditioning system of capacity 50 T.R Designed by Eng. Mohamed A.A El Shafiey Winchels Egypt WINCHELS EGYPT

 

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
1994 4 Months Supply & install of air conditioning system of capacity 200 T.R Bakry Consulting Engineers Inter Egypt SERENADE FLOATING HOTEL
1995 6 Months Supply & install of air conditioning system of capacity 130 T.R Dar Al handassah Oberoi International OBEROI PHILAE FLOATING HOTEL
1995 8 Months Supply & install of air conditioning system of capacity 300 T.R Dar Al handassah Four Seasons Co. AMBASSADOR CLUB HOTEL – HURGAHADAMANAGED BY SONESTA
1997 3 Months Supply & install of air conditioning system of capacity 80 T.R Bakry Consulting Engineers Sun rise Co. CHICOS TACOS RESTAURANT
1998 12 Months Supply & install of air conditioning system of capacity 320 T.R Bakry Consulting Engineers The Arab Investment Tourism Development Co. IBROTEL PALM BEACH HOTEL – HURGHADAPARK PLAZE
1998 24 Months All plumbing work, fire fighting and irrigation network Bakry Consulting Engineers The Arab Investment Co. LOULY BEACH VILLAGE – AIN EL SOKHNA
1999 4 Months Supply & install of air conditioning system of capacity 200 T.R Bakry Consulting Engineers Inter Egypt CAPRICE FLOATING HOTEL
2000 10 Months renovation of air conditioning (Chillers)  and heating equipments (Boilers),&  dismantling old IS2 International System Safety Engineering Club mediterranee CLUB MEDITERRANEE – LUXOR
2000 45 Days Supply & install of air conditioning system of capacity 120 T.R R & A Design Team Travco Group Of Companies MAKADY SUN RESORT – MAKADY BAY
2001 50 Days Supply & install of air conditioning system of capacity 120 T.R R & A Design Team Travco Group Of Companies MAKADY MARINE RESORT – MAKADY BAY

 

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2001 6 Months renovation of air conditioning equipments (two chillers) of 1050 T.R, & dismantling of old Bakry Consulting Engineers The Arab Company For Hotels And Tourism Investments SHERATON HOTEL TOWER – CAIRO
2001 36 Months Supply & install of air conditioning system of capacity 600 T.R Bakry Consulting Engineers Egyptian Saudi Investment Tourism Co. LE MERIDIEN HOTEL – HURGHADANOW GRAND AZUR
2002 6 Months Supply & install of air conditioning system, ventilation, &plumbing work Designed by Eng. Mohamed A.A El Shafiey Moshmat El BeiheraCo. RESEARCH VESSEL FOR LAKE NASSER
2003 90 Days Supply & install of air conditioning system of capacity 120 T.R, ventilation R & A Design Team Travco Group Of Companies BRAVO CLUB – MARSA ALAM
2003 50 Days Supply & install of air conditioning & ventilation system Naguib Consultant Travco Group Of Companies HARD ROCK CAFÉ – HURGHADA
2003 8 Months Supply & install of air conditioning system of capacity 225 T.R, ventilation system R & A Design Team Travco Group Of Companies SOLYMAR BELVEDERE HOTEL –SHARM EL SHEIKH
2004 12 Months Supply & install new boiler room (hot water boiler) & boilers accessories Renovation of all plumbing works and network. Bakry Consulting Engineers The Arab Investment Tourism Development Co. EL NOUR HILTON VILLAGE (EXTENSION & RENOVATION) – HURGHADA
2005 8 Months Supply & install of air conditioning system of capacity 225 T.R, ventilation system R & A Design Team Travco Group Of Companies MAKADY STAR HOTEL – HURGHADA
2005 6 Months Supply & install of air conditioning system of capacity 170 T.R, ventilation system R & A Design Team Travco Group Of Companies IBEROTEL LAMAYA RESORT – MARSA ALAM

 

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2005 5 Months Supply & install of air conditioning system of capacity 100 T.R, ventilation system R & A Design Team Travco Group Of Companies SAMAYA HOTEL – MARSA ALAM
2006 12 Months Supply & install Plumbing works for new extension Bakry Consulting Engineers Red Sea Company For Touristic Development. IBROTEL PALM BEACH RESORT (EXTENSION) –PARK PLAZE – HURGHADA
2006 12 Months Supply & install of air conditioning system of capacity 500 T.R, & ventilation system R & A Design Team Travco Group Of Companies MIRABEL RESORT  SHARM EL SHEIKH
2007 10 Months Supply & install of air conditioning system of capacity 600 T.R, & ventilation system R & A Design Team Travco Group Of Companies TRAVCO HEADQUARTERS – 6th OCTOBER City
2007 6 Months Supply & install new  boiler room (Steam boiler) & boilers accessories for domestic hot water, old and new swimming pool heating Bakry Consulting Engineers The Arab Company For Hotels And Tourism Investments SHERATON RESORT – LUXOR
2007 36 Months Supply & install of air conditioning system of capacity 660 T.R, & ventilation system Bakry Consulting Engineers El Najar Touristic Company EL NABILA HOTEL – HURGHADA
2008 8 Months Supply & install brackish water line for desalination station to sea (6 Km) TEC engineering & consultants Travco Group Of Companies MAKADI GOLF CLUB HOUSE – HURGHADA
2008 4 Months supply and install heating fans for air conditioning system Bakry Consulting Engineers Power Generation Engineering And Services Company PGESCO HEAD OFFICE – CAIRO

 

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2009 12 Months Supply & install of air conditioning system (one chiller) of capacity 150 T.R Bakry Consulting Engineers The Aga Khan Foundation (Egypt) NOUR EL SALAM HOUSE – ASWAN
2009 6 Months Supply & install of air conditioning system of capacity 150 T.R TEC engineering & consultants Travco Group Of Companies MAKADI GOLF CLUB HOUSE – HURGHADA
2009 12 Months Network renovation for main building and bungalows Bakry Consulting Engineers The Arab Company For Hotels And Tourism Investments SHERATON RESORT – LUXOR
2010 10 Months Supply & install of air conditioning system of capacity 320 T.R, & ventilation system R & A Design Team Travco Group Of Companies AQUAMARINA RESORT – HURGHADA
2010 One week Supply & install submersible pumps and its accessories Designed by Eng. Mohamed A.A El Shafiey UPPER EGYPT FOR TOURISTIC & REAL ESTATE DEVELOPMENT HOTB FLOATING RESTAURANT
2010 One week Supply & install submersible pumps and its accessories Designed by Eng. Mohamed A.A El Shafiey UPPER EGYPT FOR TOURISTIC & REAL ESTATE DEVELOPMENT TOUT  FLOATING RESTAURANT
2010 12 Months Boiler room renovation, two new steam boilers each 3 ton steam complete with all boilers accessories Allied Consultants Ltd As-Salam international hospital AS-SALAM INTERNATIONAL HOSPITAL -CAIRO
YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2011 8 Months Renovation of Chilled water network and Irrigation Network, as well as chilled water pumps and chemical treatment EGEIC The Arab Investment Tourism Development Co. HILTON HURGHADA RESORT- HURGHADA
2011 4 Months Supply & install of ventilation system (second phase) R & A Design Team Travco Group Of Companies AQUAMARINA RESORT – HURGHADA
2011 1 Months Supply and install Prihoda Textile Duct

Total Airflow: 287,000 m3/hr

Diameter: 1400, 1120, 900, 800 mm

Length: 322 m

Material: PMI – WH

  Kraft Foods Egypt KRAFT CANDY FACTORY ALEXANDRIA
2012 12 Months Supply & install of air conditioning system of capacity 266 T.R, & ventilation system & Fire Fighting for New Stores Building Bakry Consulting Engineers Multi Apex Pharma MULTI APEX PHARMA-BADR CITY
2012 4 Months Supply & install of air conditioning system & ventilation system (Third phase) R & A Design Team Travco Group Of Companies AQUAMARINA RESORT – HURGHADA
2012 2 Months Supply & install of air conditioning system & ventilation system Travco Engineering & Construction Travco Group Of Companies RENOVATION OF SOLYMAR PARADISE BEACH RESORT-SAFAGA
2012

 

 

1 Week Supply and install Prihoda Textile Duct in production zone

Total Airflow: 107,740 m3/hr

Diameter: 900, 710, 700 mm

Length: 99 m

Material: PMI – BL

Shaker Consultant Ltd JUHAYNA Egypt JUHAYNA FACTORY– ASSUIT 
YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2012 2 Weeks Supply and install Prihoda Textile Duct

Total Airflow: 130,800 m3/hr

Diameter: 1400, 1250, 1000, 900, 800, 710, 630            500, 315 mm

Length: 346 m

Material: PMI – BL

HoweedyConsultant NESTLE Egypt S.A.E Nestle old Ice Cream FACTORY –6th OCTOBER City
2013 1 Month Supply and install new steam lines from boiler header to eighth floor Allied Consultants Ltd As-Salam international hospital AS-SALAM INTERNATIONAL HOSPITAL -CAIRO
2013 8 months Renovation of Boiler room accessories; including two new burners, heat exchangers, and all pressure stations and steam valves, laundry steam network EHAF Consultants Ltd (Designed By Eng. Mohamed A.A El Shafiey) National company for housing S.A.E RENOVATION OF LE MERIDIEN HELIOPOLIS HOTEL-CAIRO
2013 2 Months Designing, Supply and install steam network for production area complete with all accessories Egyptrol Consultants Ltd AUG Pharma AUG PHARMACEUTICAL FACTORY  – 6th OCTOBER City
2014 2 Months Supply & install of air conditioning system of capacity 200 T.R, & ventilation system DMG Design Team Travco Group Of Companies EL GOUNA VILLA – HURGHADA

 

 

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2014 1 Month Supply and install Prihoda Textile Duct

Total Airflow: 38,000 m3/hr

Diameter: 1400, 1120, 1000, 900, 800, 710, 630, 500 mm

Length: 65 m

Material: PMI – GREY

Ehaf Consultant Egyptian Army MALL FOR ZAHRAA SPORTING CLUB FOR FORCED ARMY
2014 3 Months Supply & install of air conditioning system of capacity 100 T.R, & ventilation system R & A Design Team Travco Group Of Companies NEAMA BAY HOTEL  – SHARM EL SHEIKH
2014 4  Months Supply & install of air conditioning system of capacity 400 T.R, & ventilation system DMG Travco Group Of Companies Aqua Viva MAKADI Bay – HURGHADA
2014 3 Months Supply and install Prihoda Textile Duct

Total Airflow: Inlet 1,120,000 m3/hr

Extracted              600,000 m3/hr    Diameter: 2150, 2000, 1800, 1600, 1400, 1200, 1120, 1000, 900, 800, 710 mm

Length: 2380 m

Material: NMI – BL

Designed by Eng. Mohamed A.A El Shafiey Edita factory 6 October city Edita FACTORY –6th OCTOBER City
2014 2 Months Supply and install Prihoda Textile Duct

Total Airflow: 668,000 m3/hr

Diameter: 2200, 1800, 1600,                  710, 400 mm

Length: 804 m

Material: PMS – BL

Designed by Eng. Mohamed A.A El Shafiey Pegas Egypt PEGAS NON-WOVEN TEXTILE
YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2014 1 Months Supply and install Prihoda Textile Duct

Total Airflow: 162,000 m3/hr

Diameter: 900, 710, 500, 400, 250 mm

Length: 253 m

Material: PMI – BL

  BEL FACTORY BEL FACTORY 10 th OF RAMADAN CITY
2014 1 Months Supply and install Prihoda Textile Duct

Total Airflow: 65,000 m3/hr

Diameter: 800, 630, 400 mm

Length: 100 m

Material: PMI – GREY

MEDEC HEYA Association for fast freezing FOOD STORES IN LUXOR
2015 3 WEEKS Supply and install Prihoda Textile Duct

Total Airflow: 62,000 CFM

Diameter: 700, 400, mm

Length: 80 m

Material: PMI – GREY

MMDC EGY ARMY EGY air force base in –  Belbis
2015 2  Months Supply and install of Steam accessories for  Laundry room equipment & CSSD sterilization room &  autoclaves connection Rafet & miller Consultants Ltd As-Salam international hospital AS-SALAM INTERNATIONAL HOSPITAL -CAIRO
2015 1 months Supply Prihoda Textile Duct

Total Airflow: Inlet 30,000  m3/hr

 

Diameter: 900, 800, 710 ,450  mm

Length: 110  m

Material: PMI – Grey

ECG Consultant EL Marai EGYPT BEYTI  FACTORY – 6th OCTOBER CITY

 

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT/DESIGN BY OWNER PROJECT
2015 2 Months Install One Steam  water Boiler 2 Ton, boiler belongings equipment’s (blow down, softener, feed water tank, Chemical feed tank & other accessories). Eng. Mohamed El Magarabi Arab Investment Co. for investment RENOVATION of SHERATON EL MONTAZH HOTEL – ALEXANDRIA (Boiler room)
2016 2 Months Supply and install Air Conditioning System and ventilation for Packing Hall A (Mini Molto) Designed by Eng. Mohamed A.A El Shafiey EDITA FOR FOOD INDUSTRIES EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE
2016 2 Months Supply and install Air Conditioning System and ventilation for Packing Hall B (Mini Molto) Designed by Eng. Mohamed A.A El Shafiey EDITA FOR FOOD INDUSTRIES EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE
2016 2 Months Supply and install Air Conditioning System and ventilation for Packing Hall B (Bake Rolls Product) Designed by Eng. Mohamed A.A El Shafiey EDITA FOR FOOD INDUSTRIES EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE
2016 1 Month Supply and install Air Conditioning and Refrigeration System. Designed by Eng. Mohamed A.A El Shafiey EDITA FOR FOOD INDUSTRIES EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE
2016 1 Month Supply and install Electromechanical Works, Networks For Supply water, Hot Water, Steam and Condensate lines, Compressed Air and Chilled Water and accessories and Fire Fighting Accessories For New Production Line. Designed by Eng. Mohamed A.A El Shafiey EDITA FOR FOOD INDUSTRIES EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE

PROJECTS UNDER EXECUTION

YEAR OF COMPLETION PERIOD OF CONTRACT DESCRIPTION OF WORK CONSULTANT OWNER PROJECT
2017 7  Months Supply & install of air conditioning system of capacity 850 T.R, & ventilation system Design & Project Management Group Travco Group Of Companies BAB EL SHAMS) JAZ AL CAZAR (

HOTEL  – SHARM EL SHEIKH

2017 3 Months Supply & install of air conditioning system of capacity 120 T.R, & ventilation system Design & Project Management Group Travco Group Of Companies BAB EL SHAMS COLLECTION  – JAZ AL CAZAR – SHARM EL SHEIKH
2017 10 Months Steam, firefighting, Hot & Cold & compressed air networks Designed by Eng. Mohamed A.A El Shafiey Global Pharma for manufacturing and medicine trading GLOBAl PHARMA FACTORY – BENI SUEF CITY
2017 2 months Renovation of Boiler room accessories, including steam valves, feed water tank, blow down separator, headers Eng. Moh. El Magarabi Arab Investment Co. for development RENOVATION OF SHERATON EL MONTAZH HOTEL-ALEXANDRIA
2017 8 Months Supply & install of air conditioning system of capacity 250 T.R, & ventilation system Design & Project Management Group Travco Group Of Companies EL HARAM PALACE – CAIRO
2017 3 months Supply & install of air conditioning system of capacity 139 T.R, & ventilation system & utilities systems (hot water, Process Water ,Trace Water Network, chilled water & cold water) Howeedy Edita for sweet industries Edita Beni Swief