YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
1989 | 3 Months | Supply & install of air conditioning system of capacity 100 T.R | Designed by Eng. Mohamed A.A El Shafiey | Misr Travel | NIPHTESE FLOATING HOTEL |
1990 | 4 Months | Supply & install electrical work | Designed by Eng. Mohamed A.A El Shafiey | Mr. Mahmoud El Shaarawi | QUESSNA COLD STORE |
1990 | 4 Months | Supply & install of air conditioning system of capacity 120 T.R | Dar Al handassah (shaier & partners) | Dream Boat Co. | NILE SECRET FLOATING HOTEL |
1993 | 1.5 Months | Supply & install of air conditioning system of capacity 70 T.R | Prof. Dr. Ahmed Shaher | Misr Travel | NOPAL FLOATING RESTAURANT |
1993 | 4 Months | Supply & install of air conditioning system of capacity 80 T.R | Bakry Consulting Engineers | Red Sea Diving And Safari Co. | M/S FORTUNE – 1 FLOATING HOTEL |
1992 | 24 Months | All plumbing work, fire fighting and irrigation network | Dar Al handassah (shaier & partners) | The Arab Investment Tourism Development Co. | EL NOUR HILTON VILLAGE – HURGHADA |
1993 | 8 Months | Supply & install of air conditioning system of capacity 300 T.R | Bakry Consulting Engineers | Mr. Ahmed Abdel Wahab | ZAMALEK COMMERCIAL CENTER (KENOZE) |
1993 | 4 Months | Supply & install of air conditioning system of capacity 170 T.R | Bakry Consulting Engineers | Sakara Tours | SONESTA SUN GOODIES FLOATING HOTEL |
1994 | 1 Months | Supply & install of air conditioning system of capacity 40 T.R | Designed by Eng. Mohamed A.A El Shafiey | Mr. Khaled Sabri | KATCHO –417- RESTAURANT |
1994 | 1 Months | Supply & install of air conditioning system of capacity 50 T.R | Designed by Eng. Mohamed A.A El Shafiey | Winchels Egypt | WINCHELS EGYPT |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
1994 | 4 Months | Supply & install of air conditioning system of capacity 200 T.R | Bakry Consulting Engineers | Inter Egypt | SERENADE FLOATING HOTEL |
1995 | 6 Months | Supply & install of air conditioning system of capacity 130 T.R | Dar Al handassah | Oberoi International | OBEROI PHILAE FLOATING HOTEL |
1995 | 8 Months | Supply & install of air conditioning system of capacity 300 T.R | Dar Al handassah | Four Seasons Co. | AMBASSADOR CLUB HOTEL – HURGAHADAMANAGED BY SONESTA |
1997 | 3 Months | Supply & install of air conditioning system of capacity 80 T.R | Bakry Consulting Engineers | Sun rise Co. | CHICOS TACOS RESTAURANT |
1998 | 12 Months | Supply & install of air conditioning system of capacity 320 T.R | Bakry Consulting Engineers | The Arab Investment Tourism Development Co. | IBROTEL PALM BEACH HOTEL – HURGHADAPARK PLAZE |
1998 | 24 Months | All plumbing work, fire fighting and irrigation network | Bakry Consulting Engineers | The Arab Investment Co. | LOULY BEACH VILLAGE – AIN EL SOKHNA |
1999 | 4 Months | Supply & install of air conditioning system of capacity 200 T.R | Bakry Consulting Engineers | Inter Egypt | CAPRICE FLOATING HOTEL |
2000 | 10 Months | renovation of air conditioning (Chillers) and heating equipments (Boilers),& dismantling old | IS2 International System Safety Engineering | Club mediterranee | CLUB MEDITERRANEE – LUXOR |
2000 | 45 Days | Supply & install of air conditioning system of capacity 120 T.R | R & A Design Team | Travco Group Of Companies | MAKADY SUN RESORT – MAKADY BAY |
2001 | 50 Days | Supply & install of air conditioning system of capacity 120 T.R | R & A Design Team | Travco Group Of Companies | MAKADY MARINE RESORT – MAKADY BAY |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2001 | 6 Months | renovation of air conditioning equipments (two chillers) of 1050 T.R, & dismantling of old | Bakry Consulting Engineers | The Arab Company For Hotels And Tourism Investments | SHERATON HOTEL TOWER – CAIRO |
2001 | 36 Months | Supply & install of air conditioning system of capacity 600 T.R | Bakry Consulting Engineers | Egyptian Saudi Investment Tourism Co. | LE MERIDIEN HOTEL – HURGHADANOW GRAND AZUR |
2002 | 6 Months | Supply & install of air conditioning system, ventilation, &plumbing work | Designed by Eng. Mohamed A.A El Shafiey | Moshmat El BeiheraCo. | RESEARCH VESSEL FOR LAKE NASSER |
2003 | 90 Days | Supply & install of air conditioning system of capacity 120 T.R, ventilation | R & A Design Team | Travco Group Of Companies | BRAVO CLUB – MARSA ALAM |
2003 | 50 Days | Supply & install of air conditioning & ventilation system | Naguib Consultant | Travco Group Of Companies | HARD ROCK CAFÉ – HURGHADA |
2003 | 8 Months | Supply & install of air conditioning system of capacity 225 T.R, ventilation system | R & A Design Team | Travco Group Of Companies | SOLYMAR BELVEDERE HOTEL –SHARM EL SHEIKH |
2004 | 12 Months | Supply & install new boiler room (hot water boiler) & boilers accessories Renovation of all plumbing works and network. | Bakry Consulting Engineers | The Arab Investment Tourism Development Co. | EL NOUR HILTON VILLAGE (EXTENSION & RENOVATION) – HURGHADA |
2005 | 8 Months | Supply & install of air conditioning system of capacity 225 T.R, ventilation system | R & A Design Team | Travco Group Of Companies | MAKADY STAR HOTEL – HURGHADA |
2005 | 6 Months | Supply & install of air conditioning system of capacity 170 T.R, ventilation system | R & A Design Team | Travco Group Of Companies | IBEROTEL LAMAYA RESORT – MARSA ALAM |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2005 | 5 Months | Supply & install of air conditioning system of capacity 100 T.R, ventilation system | R & A Design Team | Travco Group Of Companies | SAMAYA HOTEL – MARSA ALAM |
2006 | 12 Months | Supply & install Plumbing works for new extension | Bakry Consulting Engineers | Red Sea Company For Touristic Development. | IBROTEL PALM BEACH RESORT (EXTENSION) –PARK PLAZE – HURGHADA |
2006 | 12 Months | Supply & install of air conditioning system of capacity 500 T.R, & ventilation system | R & A Design Team | Travco Group Of Companies | MIRABEL RESORT – SHARM EL SHEIKH |
2007 | 10 Months | Supply & install of air conditioning system of capacity 600 T.R, & ventilation system | R & A Design Team | Travco Group Of Companies | TRAVCO HEADQUARTERS – 6th OCTOBER City |
2007 | 6 Months | Supply & install new boiler room (Steam boiler) & boilers accessories for domestic hot water, old and new swimming pool heating | Bakry Consulting Engineers | The Arab Company For Hotels And Tourism Investments | SHERATON RESORT – LUXOR |
2007 | 36 Months | Supply & install of air conditioning system of capacity 660 T.R, & ventilation system | Bakry Consulting Engineers | El Najar Touristic Company | EL NABILA HOTEL – HURGHADA |
2008 | 8 Months | Supply & install brackish water line for desalination station to sea (6 Km) | TEC engineering & consultants | Travco Group Of Companies | MAKADI GOLF CLUB HOUSE – HURGHADA |
2008 | 4 Months | supply and install heating fans for air conditioning system | Bakry Consulting Engineers | Power Generation Engineering And Services Company | PGESCO HEAD OFFICE – CAIRO |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2009 | 12 Months | Supply & install of air conditioning system (one chiller) of capacity 150 T.R | Bakry Consulting Engineers | The Aga Khan Foundation (Egypt) | NOUR EL SALAM HOUSE – ASWAN |
2009 | 6 Months | Supply & install of air conditioning system of capacity 150 T.R | TEC engineering & consultants | Travco Group Of Companies | MAKADI GOLF CLUB HOUSE – HURGHADA |
2009 | 12 Months | Network renovation for main building and bungalows | Bakry Consulting Engineers | The Arab Company For Hotels And Tourism Investments | SHERATON RESORT – LUXOR |
2010 | 10 Months | Supply & install of air conditioning system of capacity 320 T.R, & ventilation system | R & A Design Team | Travco Group Of Companies | AQUAMARINA RESORT – HURGHADA |
2010 | One week | Supply & install submersible pumps and its accessories | Designed by Eng. Mohamed A.A El Shafiey | UPPER EGYPT FOR TOURISTIC & REAL ESTATE DEVELOPMENT | HOTB FLOATING RESTAURANT |
2010 | One week | Supply & install submersible pumps and its accessories | Designed by Eng. Mohamed A.A El Shafiey | UPPER EGYPT FOR TOURISTIC & REAL ESTATE DEVELOPMENT | TOUT FLOATING RESTAURANT |
2010 | 12 Months | Boiler room renovation, two new steam boilers each 3 ton steam complete with all boilers accessories | Allied Consultants Ltd | As-Salam international hospital | AS-SALAM INTERNATIONAL HOSPITAL -CAIRO |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2011 | 8 Months | Renovation of Chilled water network and Irrigation Network, as well as chilled water pumps and chemical treatment | EGEIC | The Arab Investment Tourism Development Co. | HILTON HURGHADA RESORT- HURGHADA |
2011 | 4 Months | Supply & install of ventilation system (second phase) | R & A Design Team | Travco Group Of Companies | AQUAMARINA RESORT – HURGHADA |
2011 | 1 Months | Supply and install Prihoda Textile Duct
Total Airflow: 287,000 m3/hr Diameter: 1400, 1120, 900, 800 mm Length: 322 m Material: PMI – WH |
Kraft Foods Egypt | KRAFT CANDY FACTORY ALEXANDRIA | |
2012 | 12 Months | Supply & install of air conditioning system of capacity 266 T.R, & ventilation system & Fire Fighting for New Stores Building | Bakry Consulting Engineers | Multi Apex Pharma | MULTI APEX PHARMA-BADR CITY |
2012 | 4 Months | Supply & install of air conditioning system & ventilation system (Third phase) | R & A Design Team | Travco Group Of Companies | AQUAMARINA RESORT – HURGHADA |
2012 | 2 Months | Supply & install of air conditioning system & ventilation system | Travco Engineering & Construction | Travco Group Of Companies | RENOVATION OF SOLYMAR PARADISE BEACH RESORT-SAFAGA |
2012
|
1 Week | Supply and install Prihoda Textile Duct in production zone
Total Airflow: 107,740 m3/hr Diameter: 900, 710, 700 mm Length: 99 m Material: PMI – BL |
Shaker Consultant Ltd | JUHAYNA Egypt | JUHAYNA FACTORY– ASSUIT |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2012 | 2 Weeks | Supply and install Prihoda Textile Duct
Total Airflow: 130,800 m3/hr Diameter: 1400, 1250, 1000, 900, 800, 710, 630 500, 315 mm Length: 346 m Material: PMI – BL |
HoweedyConsultant | NESTLE Egypt S.A.E | Nestle old Ice Cream FACTORY –6th OCTOBER City |
2013 | 1 Month | Supply and install new steam lines from boiler header to eighth floor | Allied Consultants Ltd | As-Salam international hospital | AS-SALAM INTERNATIONAL HOSPITAL -CAIRO |
2013 | 8 months | Renovation of Boiler room accessories; including two new burners, heat exchangers, and all pressure stations and steam valves, laundry steam network | EHAF Consultants Ltd (Designed By Eng. Mohamed A.A El Shafiey) | National company for housing S.A.E | RENOVATION OF LE MERIDIEN HELIOPOLIS HOTEL-CAIRO |
2013 | 2 Months | Designing, Supply and install steam network for production area complete with all accessories | Egyptrol Consultants Ltd | AUG Pharma | AUG PHARMACEUTICAL FACTORY – 6th OCTOBER City |
2014 | 2 Months | Supply & install of air conditioning system of capacity 200 T.R, & ventilation system | DMG Design Team | Travco Group Of Companies | EL GOUNA VILLA – HURGHADA |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2014 | 1 Month | Supply and install Prihoda Textile Duct
Total Airflow: 38,000 m3/hr Diameter: 1400, 1120, 1000, 900, 800, 710, 630, 500 mm Length: 65 m Material: PMI – GREY |
Ehaf Consultant | Egyptian Army | MALL FOR ZAHRAA SPORTING CLUB FOR FORCED ARMY |
2014 | 3 Months | Supply & install of air conditioning system of capacity 100 T.R, & ventilation system | R & A Design Team | Travco Group Of Companies | NEAMA BAY HOTEL – SHARM EL SHEIKH |
2014 | 4 Months | Supply & install of air conditioning system of capacity 400 T.R, & ventilation system | DMG | Travco Group Of Companies | Aqua Viva MAKADI Bay – HURGHADA |
2014 | 3 Months | Supply and install Prihoda Textile Duct
Total Airflow: Inlet 1,120,000 m3/hr Extracted 600,000 m3/hr Diameter: 2150, 2000, 1800, 1600, 1400, 1200, 1120, 1000, 900, 800, 710 mm Length: 2380 m Material: NMI – BL |
Designed by Eng. Mohamed A.A El Shafiey | Edita factory 6 October city | Edita FACTORY –6th OCTOBER City |
2014 | 2 Months | Supply and install Prihoda Textile Duct
Total Airflow: 668,000 m3/hr Diameter: 2200, 1800, 1600, 710, 400 mm Length: 804 m Material: PMS – BL |
Designed by Eng. Mohamed A.A El Shafiey | Pegas Egypt | PEGAS NON-WOVEN TEXTILE |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT |
2014 | 1 Months | Supply and install Prihoda Textile Duct
Total Airflow: 162,000 m3/hr Diameter: 900, 710, 500, 400, 250 mm Length: 253 m Material: PMI – BL |
BEL FACTORY | BEL FACTORY 10 th OF RAMADAN CITY | |
2014 | 1 Months | Supply and install Prihoda Textile Duct
Total Airflow: 65,000 m3/hr Diameter: 800, 630, 400 mm Length: 100 m Material: PMI – GREY |
MEDEC | HEYA Association for fast freezing | FOOD STORES IN LUXOR |
2015 | 3 WEEKS | Supply and install Prihoda Textile Duct
Total Airflow: 62,000 CFM Diameter: 700, 400, mm Length: 80 m Material: PMI – GREY |
MMDC | EGY ARMY | EGY air force base in – Belbis |
2015 | 2 Months | Supply and install of Steam accessories for Laundry room equipment & CSSD sterilization room & autoclaves connection | Rafet & miller Consultants Ltd | As-Salam international hospital | AS-SALAM INTERNATIONAL HOSPITAL -CAIRO |
2015 | 1 months | Supply Prihoda Textile Duct
Total Airflow: Inlet 30,000 m3/hr
Diameter: 900, 800, 710 ,450 mm Length: 110 m Material: PMI – Grey |
ECG Consultant | EL Marai EGYPT | BEYTI FACTORY – 6th OCTOBER CITY |
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT/DESIGN BY | OWNER | PROJECT | |
2015 | 2 Months | Install One Steam water Boiler 2 Ton, boiler belongings equipment’s (blow down, softener, feed water tank, Chemical feed tank & other accessories). | Eng. Mohamed El Magarabi | Arab Investment Co. for investment | RENOVATION of SHERATON EL MONTAZH HOTEL – ALEXANDRIA (Boiler room) | |
2016 | 2 Months | Supply and install Air Conditioning System and ventilation for Packing Hall A (Mini Molto) | Designed by Eng. Mohamed A.A El Shafiey | EDITA FOR FOOD INDUSTRIES | EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE | |
2016 | 2 Months | Supply and install Air Conditioning System and ventilation for Packing Hall B (Mini Molto) | Designed by Eng. Mohamed A.A El Shafiey | EDITA FOR FOOD INDUSTRIES | EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE | |
2016 | 2 Months | Supply and install Air Conditioning System and ventilation for Packing Hall B (Bake Rolls Product) | Designed by Eng. Mohamed A.A El Shafiey | EDITA FOR FOOD INDUSTRIES | EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE | |
2016 | 1 Month | Supply and install Air Conditioning and Refrigeration System. | Designed by Eng. Mohamed A.A El Shafiey | EDITA FOR FOOD INDUSTRIES | EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE | |
2016 | 1 Month | Supply and install Electromechanical Works, Networks For Supply water, Hot Water, Steam and Condensate lines, Compressed Air and Chilled Water and accessories and Fire Fighting Accessories For New Production Line. | Designed by Eng. Mohamed A.A El Shafiey | EDITA FOR FOOD INDUSTRIES | EDITA FACTORY (E 07) – 6th OCTOBER INDUSTRIAL ZONE |
PROJECTS UNDER EXECUTION
YEAR OF COMPLETION | PERIOD OF CONTRACT | DESCRIPTION OF WORK | CONSULTANT | OWNER | PROJECT |
2017 | 7 Months | Supply & install of air conditioning system of capacity 850 T.R, & ventilation system | Design & Project Management Group | Travco Group Of Companies | BAB EL SHAMS) JAZ AL CAZAR (
HOTEL – SHARM EL SHEIKH |
2017 | 3 Months | Supply & install of air conditioning system of capacity 120 T.R, & ventilation system | Design & Project Management Group | Travco Group Of Companies | BAB EL SHAMS COLLECTION – JAZ AL CAZAR – SHARM EL SHEIKH |
2017 | 10 Months | Steam, firefighting, Hot & Cold & compressed air networks | Designed by Eng. Mohamed A.A El Shafiey | Global Pharma for manufacturing and medicine trading | GLOBAl PHARMA FACTORY – BENI SUEF CITY |
2017 | 2 months | Renovation of Boiler room accessories, including steam valves, feed water tank, blow down separator, headers | Eng. Moh. El Magarabi | Arab Investment Co. for development | RENOVATION OF SHERATON EL MONTAZH HOTEL-ALEXANDRIA |
2017 | 8 Months | Supply & install of air conditioning system of capacity 250 T.R, & ventilation system | Design & Project Management Group | Travco Group Of Companies | EL HARAM PALACE – CAIRO |
2017 | 3 months | Supply & install of air conditioning system of capacity 139 T.R, & ventilation system & utilities systems (hot water, Process Water ,Trace Water Network, chilled water & cold water) | Howeedy | Edita for sweet industries | Edita Beni Swief |